Kitchen floor day 3 – The first attempt at levelling the floor

After the floor was ground down Matthew and Liegh the company who ground the floor down laid a leveling compound, it looks like a cement based product, after it had dried here is the state of the what was left.

This was a mess, there are more photos below in the slideshow, the floor was left full of lumps and bumps, uneven and now at a higher level than the connected rooms.

[2jslideshow id=”556″]

Next Page – Kitchen floor day 4 – New floor was meant to be fitted