Kitchen floor day 3 – The first attempt at levelling the floor

After the floor was ground down Matthew and Liegh the company who ground the floor down laid a leveling compound, it looks like a cement based product, after it had dried here is the state of the what was left.

This was a mess, there are more photos below in the slideshow, the floor was left full of lumps and bumps, uneven and now at a higher level than the connected rooms.

IMG_20180913_173235IMG_20180913_173239IMG_20180913_173233IMG_20180913_173231IMG_20180913_173223IMG_20180913_173221IMG_20180913_173218IMG_20180913_173156IMG_20180913_173151IMG_20180913_173148IMG_20180913_173143IMG_20180913_173139IMG_20180913_173135

Next Page – Kitchen floor day 4 – New floor was meant to be fitted