Kitchen floor day 2 – Grinding down the concrete

Day 2 involved the flooring workmen grinding down the concrete floor to remove the high spots, a process that was described by wainhomes as supposedly dust free.

Here is the area of the floor that was ground down.

here are some pictures of the dust left in the room.

Here is a picture of the dust left clinging to the walls and the wall clock that was covered during the grinding process.

The cleaners came out and did not do a decent job at all, after complaining to wainhomes they sent another set of cleaners out, as the first just cleaned the kitchen surfaces and nothing else.

Next Page – Kitchen floor day 3 – The first attempt at levelling the floor